Construction Activities and Traffic Management for the North Hudson Sewerage Authority's H6/H7 Phase 2 Project for the Period March 11, 2024, through March 15, 2024

Anticipated Construction Activities and Traffic Management for the NHSA H6/H7 Phase 2 project for the period 03/11/2024 through 03/15/2024 is as follows:

Construction Activities

  • Gas main relocation on Adams Street between 14th Street and 15th Street.

Traffic Management

  • Adams Street between 13th Street and 15th Street will be closed to thru traffic during the day from 3/11 thru 3/13.

  • 2 HPD Officers will be present on site to assist in traffic redirection. One will be located at 13th, and one will be located at 15th. 

  • No parking signs will be placed on both sides of Adams Street between 13th Street and 15th Street from 3/11 thru 3/13.

  • There may be partial impacts to the sidewalks on 13th and Adams, 14th and Adams, and 15th and Adams in the Work area, however, safe passage for pedestrian traffic will be provided at all times.

  • Adams Street between 14th Street and 15th Street will be closed to thru traffic during the day from 3/13 thru 3/15.

  • 2 HPD Officers will be present on site to assist in traffic redirection. One will be located at 14th, and one will be located at 15th. 

  • No parking signs will be placed on both sides of Adams Street between 14th Street and 15th Street from 3/11 thru 3/15.

  • There may be partial impacts to the sidewalks on 14th and Adams and 15th and Adams in the Work area, however, safe passage for pedestrian traffic will be provided at all times.

  • 15th Street and Adams Street will be two lane traffic on 3/14 and 3/15. Traffic to be shifted to North Side of 15th Street on 3/14 and shifted to South Side of 15th Street on 3/15.

  • 2 HPD Officer will be present at 15th Street and Adams Street to assist in traffic redirection.

  • No parking signs will be placed on 15th Street from Adams Street to Grand Street north and south side on 3/14 and 3/15.

  • There may be partial impacts to the sidewalks on 15th and Adams in the Work area, however, safe passage for pedestrian traffic will be provided at all times.

Previous
Previous

North Hudson Sewerage Authority Weehawken Infrastructure Project: Two-Week Look Ahead for March 18th to March 29th, 2024

Next
Next

North Hudson Sewerage Authority H6/H7 Phase 2: Construction and Traffic Management Activities - March 4th to March 8th, 2024