Madison Street Infrastructure Improvements: Construction and Traffic Management Activities April 14th - April 18th
Madison Street Infrastructure Improvements
The Madison Street Area Infrastructure Improvements project will help mitigate localized flooding from rain events. The project scope includes replacing existing inlets, sewers, and water lines as well as elevating roadways, curbs, and sidewalks within the area. These improvements will alleviate the primary concerns by conveying stormwater into the sewer system.
Work on the Madison Street Area Infrastructure Improvements will require parking restrictions, partial road closures, and 24-hour closure of Madison. Area residents will be kept apprised of the work and impacts on their quality of life.
The following work and traffic management activities are anticipated for Monday, April 14th through Friday, April 18th between the hours of 8 a.m. and 4 p.m.:
Work Activities:
Madison St between 10th and 11th Street
Maintain sewer bypass.
Reconnect existing sewer laterals to new sewer.
Continue backfilling new sewer and water main.
Install new fire hydrant.
Install new street light foundations and conduits.
Install new curb on the east side (1000 Jefferson) and west side (Shoprite) of Madison St.
Install new sidewalk on the west side (Shoprite) of Madison St.
Demo existing sidewalk at east side (1000 Jefferson) of Madison St.
PSE&G to install gas line on Tuesday 04/15/2025 (weather depending).
Madison St between 9th and 10th Street
Demo existing roadway pavement for helical pile installation.
Start Installing Helical Piles.
Traffic Management:
Full closure on Madison St between 11th and 10th Street.
No-Parking on Madison St between 10th and 9th Street. Maintain one (1) travel lane.
HPD will be on-site to assist with traffic management during construction.