NHSA H6/H7 Phase 2: Construction and Traffic Management Activities 09/30/2024 through 10/04/2024
Anticipated Construction Activities and Traffic Management for the NHSA H6/H7 Phase 2 project for the period 09/30/2024 through 10/04/2024 is as follows:
Construction Activities
Installing Structure Pile Caps – Adams Street between 14th and 15th Streets
Potential Control Building Work – No traffic Impact
Traffic Management
Adams Street between 14th Street and 15th Street will be closed to thru traffic during the day from 9/30 thru 10/4.
2 HPD Officers will be present on-site to assist in traffic redirection. One will be located at 14th Street, and one will be located at 15th Street.
No parking signs will be placed on both sides of Adams Street between 14th Street and 15th Street from 9/30 thru 10/4.
There may be partial impacts to the sidewalks on Adams between 14th and 15th Streets in the Work area, however, safe passage for pedestrian traffic will be provided at all times.