Madison Street Infrastructure Improvements: Construction and Traffic Management Activities April 7th - April 11th

Madison Street Infrastructure Improvements

The Madison Street Area Infrastructure Improvements project will help mitigate localized flooding from rain events. The project scope includes replacing existing inlets, sewers, and water lines as well as elevating roadways, curbs, and sidewalks within the area. These improvements will alleviate the primary concerns by conveying stormwater into the sewer system.  

Work on the Madison Street Area Infrastructure Improvements will require parking restrictions, partial road closures, and 24-hour closure of Madison. Area residents will be kept apprised of the work and impacts on their quality of life.  

The following work and traffic management activities are anticipated for Monday, April 7th through Friday, April 11th between the hours of 8 a.m. and 4 p.m.:

Work Activities:

  • Madison St between 10th and 11th Street 

    • Maintain Sewer Bypass b/w 10th St and 11th St.

    • Install New Watermain and Sewer pipe.

    • Reconnect the lateral pipes. 

    • Backfilling after the installation of new Sewer and Water Main pipes. 

    • Demo existing sidewalk on West side (ShopRite parking facility).

    • Install the pipe and inlets 15,17 and 18. 

    • Install the electrical pole bases for PSEG lights.

    • Install the conduits for PSEG light poles. 

Traffic Management:

  • Madison St full closure between 10th and 11th Street.

  • No-Parking on Madison St between 10th and 11th Street.

  • HPD will be on-site to assist with traffic management during construction.

Previous
Previous

NHSA H6/H7 Hoboken Phase 2 Construction and Traffic Management Activities: April 7th – April 11th, 2025

Next
Next

NHSA H6/H7 Hoboken Phase 2 Construction and Traffic Management Activities: March 31st – April 4th, 202