Madison Street Infrastructure Improvements: Construction and Traffic Management Activities March 31st - April 4th

Madison Street Infrastructure Improvements

The Madison Street Area Infrastructure Improvements project will help mitigate localized flooding from rain events. The project scope includes replacing existing inlets, sewers, and water lines as well as elevating roadways, curbs, and sidewalks within the area. These improvements will alleviate the primary concerns by conveying stormwater into the sewer system.  

Work on the Madison Street Area Infrastructure Improvements will require parking restrictions, partial road closures, and 24-hour closure of Madison. Area residents will be kept apprised of the work and impacts on their quality of life.  

The following work and traffic management activities are anticipated for Monday, March 31st through Friday, April 4th between the hours of 8 a.m. and 4 p.m.:

Work Activities:

  • Madison St between 10th and 11th Street 

    • Maintain sewer bypass.

    • Continue install of new watermain, sewer pipe and drainage inlets.

    • Connect existing sewer laterals to new 42” sewer.

    • Complete tie in of new 42” sewer to the existing sewer at 11th St.

    • Demo existing sidewalk on west side of Madison St (adjacent to ShopRite parking lot).

Traffic Management:

  • Madison St full closure between 10th and 11th Street.

  • No-Parking on Madison St between 10th and 11th Street.

  • HPD will be on-site to assist with traffic management during construction.

  • Sidewalk on west side of Madison St will be closed to pedestrians.